
Major strategic integration research and development
2019 -
Longsheng Research Institute
Coordinates: Shaoxing, Zhejiang
Design area: 22120 ㎡
Project Introduction
Longsheng Research Institute has a total construction area of 154077 ㎡ and a land area of 5714.79 ㎡. It is divided into four phases of 1. 2. 3. and is constructed in stages. The main entrance of the park is located on the north, east and west sides of the base. Phase I is located on the west side of the base, mainly composed of production area and office and living area. The production area is located on the north side of the first phase. It mainly includes four buildings, namely, synthetic laboratory building 1#, synthetic laboratory building 2#, test center and comprehensive research and development building, all of which are three-story buildings.
ONLY THOSE WHO INTEGRATE ARE THE SOLVERS